How can I ensure that all components are horizontally or vertically aligned with each other?

A complete and correct installation can be demonstrated by a 100% vertical and horizontal alignment between the posts while precisely maintaining the necessary gaps.
That is the only way to be able to place the workout bars in the desired height, both quickly and without any problems.
So that you can aim to achieve a perfect result, we provide a tool to ensure that everything is properly aligned. This tool is an M12 size threaded rod, including nuts and washers. You attach the threaded bolt on each of the two uprights to achieve a perfect, millimeter-precise end result before setting the bars in concrete. Once the foundations of hardened, the threaded bolt should be removed.


Aufstellung und Ausrichtung der Turnstange mit Gewindestange



Recently Viewed

No products

Menu